Middlemore
Hospital

MiTek PosiStrut provides the answer for Auckland’s Busiest Hospital

THE NEW ACUTE MENTAL HEALTH UNIT AT MIDDLEMORE HOSPITAL IS A REPLACEMENT FOR THE EXISTING TIAHO MAI BUILDING.

One of the key design drivers was the need to allow clear space within the ceiling areas for installation and maintenance of building services. When Nicholas Wedde’s and the Design Team at Klein Architects looked for the best options to provide this, MiTek PosiStrut became the obvious choice.

POSISTRUT’S GIVES YOU UNEQUALLED DESIGN FREEDOM ACROSS A WIDE RANGE OF APPLICATIONS FOR BOTH FLOOR AND ROOF IN DOMESTIC, INDUSTRIAL AND COMMERCIAL APPLICATIONS
Klein Architects
Nicholas Wedde

DOWNLOAD THE FULL CASE STUDY HERE

DOWNLOAD